CONTRACTUAL POWER PLANT PERFORMANCE TEST
Contractual power plant performance testing to verify the power plant performance guarantees for new power plants as well for upgrade, maintenance and LTSA programs in existing plants.
Compliance with the performance testing protocols from ASME, ISO, DIN and other standardization entities.
INDEPENDENT & IMPARTIAL
Contractual power plant performance test to verify the power plant performance guarantees in new and existing power plants. The goal is to compare the testing results vs the performance guarantees and in case of a shortfall being able to pinpoint the potential causes.
The measured values are corrected back to the reference site conditions using the contractual correction curves.
A site-specific performance test procedure will be created following the guidelines from performance testing codes such as ASME, DIN and ISO. A test uncertainty will be calculated to verify that is within the expected values specified in ASME PTC 19.1 for the type of power plant, fuel and plant configuration.
LEVELS OF ACCURACY & PRECISION
Power Plant Performance Test
TYPICAL PARAMETERS
These are some of the typical parameters guaranteed in new and existing power plants. Depending on the contract, additional parameters can be included.
BOUNDARY & REFERENCE CONDITIONS
To evaluate the power plant performance guarantees successfully it is important to define the boundary and reference conditions based on the contractual specifications.
CORRECTION CURVES
In order to translate the measured results back to the reference conditions, there is the need to have power plant performance correction curves that accurate reflect the impact of the difference parameters in the performance of the power plant. Per ASME PTC 46 section 5, these correction factors should be used by agreement with the all the involved parties.
It should be noted that individual equipment correction curves are used to evaluate the specific equipment and can’t be combined to calculate the overall plant performance. The overall plant performance curves are the result of modeling the plant using software like EBSILON, THERMOFLOW and others. This allow to reflect the effect of each reference parameter in the total plant and the combined operation of each power plant equipment. We can help you create the power plant performance model and the required power plant performance correction curves for evaluating the power plant performance guarantees.
SOME OF THE TESTING CODES USED FOR PERFORMANCE TESTING
ASME PTC 46 Performance Test Code – Overall Power Plant Performance
ASME PTC 4 – Fired Boiler Performance Test Code
ASME PTC 6 Performance Test Code – Steam Turbines
ASME PTC 22 Gas Turbine Performance
ASME PTC 4.4 Gas Turbine Heat Recovery Steam Generators
ASME PTC 12.2 Performance Test Code – Steam Surface Condensers
AGA Report No. 3, Part 2: Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids
ASME PTC 19.1 Performance Test Code – Test Uncertainty
ASME PTC 19.5 Flow Measurement Save
REQUEST A QUOTE
Thank you for your interest.
Please fill out the form to inquire about our services.
REQUEST
A
QUOTE
Thank you for your interest.
Please fill out the form to inquire about our services.