Power Plant Performance Testing
CONDUCTING A
PERFORMANCE TEST
POWER PLANT PERFORMANCE TESTING
The scope of our power plant performance services include all the activities related to testing documentation, supply precision testing instrumentation, on-site preparations and logistics to conduct and impartial and accurate evaluation. Our team works together with our customers from the beginning of the project until the final approval of the performance testing reports.
Our goal is to conduct an impartial and accurate evaluation of your power plant performance.
DOCUMENTATION
These are some of the most important documents that we will create for your plant as part of our power plant performance services.
PRECISION TESTING INSTRUMENTATION
Our power plant performance services include to supply high-precision testing instrumentation. The instruments used for testing are of typically of higher precision than the plant instrumentation. All instruments will hold a valid NIST-Traceable calibration certificate or equivalent.
TESTING COORDINATION
Our team will manage the entire performance testing program. Several activities and planning occur even before our team arrives to the site.
Together with our customer we will coordinate the testing activities such as:
ON-SITE PERFORMANCE TEST EXECUTION
At site our field engineers and instrumentation specialists will take care of all the preparations and activities to conduct and accurate and impartial performance test. Our power plant performance services include acting as the testing director and supporting all the request from our customer.
The final goal is to ensure that the performance test is executed in accordance with the international accepted protocols, such as ASME PTC 46 and others specifically for your power plant. Some of the key activities that our team will conduct a performance test are:
LIST OF MOST RELEVANT TESTING CODES
ASME PTC 46 Performance Test Code – Overall Power Plant Performance
ASME PTC 4 – Fired Boiler Performance Test Code
ASME PTC 6 Performance Test Code – Steam Turbines
ASME PTC 22 Gas Turbine Performance
ASME PTC 4.4 Gas Turbine Heat Recovery Steam Generators
ASME PTC 12.2 Performance Test Code – Steam Surface Condensers
AGA Report No. 3, Part 2: Orifice Metering of Natural Gas and Other Related Hydrocarbon Fluids
ASME PTC 19.1 Performance Test Code – Test Uncertainty
ASME PTC 19.5 Flow Measurement Save
REQUEST
A
QUOTE
Thank you for your interest.
Please fill out the form to inquire about our services to conduct a performance test.
REQUEST
A
QUOTE
Thank you for your interest.
Please fill out the form to inquire about our services to conduct a performance test.